PROJECT PROFILES

MBDA Industrial Units, Stevenage

Client Name: MBDA

Role: Employer's Agent and Cost Manager

Description

Industrial units, refurbishments and air conditioning replacement programme to meet key project driver was a need to address the disruptive, inefficient and costly way in which the existing systems were required to be serviced. A long-term cost/benefit analysis was carried out and it was decided that replacing the current VRF systems with VRV systems would be more cost-effective in the long-term, as all of the plant would be centralised. In conjunction with this, the existing high level walkways have been strengthened.